How to plan moving your agricultural research laboratory

Agricultural research runs to its own strict timetable.  If you’ve grown out of your current laboratory and you’re planning to move to new premises, then planning needs to work with your research deadlines, not against them.  This includes phasing around trials and important fieldwork.

You will also need to consider relocating your complex equipment.  Growth chambers, ULT freezers and instrumentation are costly to replace when moves go wrong.

In this guide, we’ll look at the key planning decisions required when moving Agritech labs and how to avoid the most common pitfalls many organisations find challenging.

Benchmark Services has twenty-five years of experience in lab relocation. Speak to our team here for more information.

The move should revolve around your research calendar

The most important starting point for any agricultural lab move is the research calendar.  From the point at which you’ve found your new site, you will need to start working your move dates around your trial window and your key research deadlines.  Finding a relocation partner, such as Benchmark Services, will take time, as will the packing, decommissioning and cleaning of your equipment prior to the move.

A move can be made at any time of year, whereas growing seasons and sampling windows are fixed to the spring and summer months.  Once you have a rough date in mind, make sure the team are fully aware so they can build their project time around it.

Begin your relocation inventory

One of the most important phases, early on in the planning stage, is to inventory and log all of the items you will need to move.  This includes your furniture and glassware as well as the large or technical equipment.  The more accurate your inventory, the better prepared your relocation removals partner will be on move day.  You will also receive a more accurate quote.  When you create your inventory, note which items require decommissioning, installation, calibration, or are fragile.  Make sure it’s clear which items need the most preparation before the move, and which will require installation and recommissioning afterwards.  Making sure you have this information early will go a long way to reducing the risks to people and equipment during the move.

We can help with equipment inventories and logs; speak to our team for assistance.

Complete site visits with your logistics partner

A specialist laboratory relocation partner, such as Benchmark Services, will complete site visits at both the old and new locations before any planning is completed.  Together, you can then isolate areas of restricted access, including unlevel floors, stairs or narrow doorways and floor loading limits.

You should then also assess the routes between the two locations, including traffic levels and the busiest or quietest parts of the day.

If you already have your new agritech lab site identified, speak to our team, and we can help you assess the relocation between them.

Planning to move growth chambers and controlled environment equipment

Plant growth chambers

A plant growth chamber is designed to maintain very tight tolerances, so moving one can be a complex manoeuvre.  The chambers are heavy and have calibrated control systems and freezer units built in, so specialist movers who understand how to avoid impact, shocks and powered transportation are essential.

When you complete your inventory, speak to your manufacturer and ask them about the specifics regarding decommissioning, cleaning and restarting your growth chamber in the new laboratory.  Also check for any hazardous goods in transit requirements.

Benchmark Services provides a white glove relocation service which includes delivery to point of use as well as recalibration where required (with one of our partners).  Visit our white glove services page to find out more.

Analytical instruments and imaging equipment

It’s not just growth chambers that will prove challenging to move.  Mass spectrometers and other analytical instruments will have fine tolerances and require stability in transport.  Imaging equipment containing high-end cameras and sensors will also require care and additional time to pack properly.  They will need dismantling in the right order, with everything labelled correctly for reinstallation at the new site.

Your sensitive and expensive equipment will take time to pack down.  So ensure you build enough space in your relocation plan to accommodate this fully; rushing this stage could have a significant effect on your downtime and research deadlines further down the line.

We’re specialists in moving hazardous, precision or heavy equipment and machinery.  Find out more here.

Preparing samples and cold storage items for relocation

Biological samples and materials, once lost, take valuable time and money to replace and can threaten entire research projects if they are destroyed.  When you are inventorying your laboratory, assess which samples are required for the move, the necessary protection needed when they are moved and which can be duplicated or discarded.

If you require ULT freezers (Ultra Low Temperature) moving, then you will need a transport company that can movement under power, with regular monitoring and stable power.  Benchmark Services has 25 years of experience in relocating ULT, LN2 and Cryo freezers.  Find out more here.

Key Agrilab relocation questions

The following checklist should help you identify potential risks in your agritech relocation plan:

  • When is the peak season for your research trials, and can you avoid moving during this period?
  • Do you know which trials can be paused, completed before a move or moved alongside the relocation if necessary?
  • Have you got a list of manufacturers for your complex equipment, and can they provide guidance on dismantling or decommissioning it?
  • How will you transport your samples, and what is the priority before the move begins?
  • What are the main challenges in transporting lab equipment between sites, and is it necessary to complete it out of hours?

If you are struggling with the answer to any of these questions, then speak to our team.  If you are ready with your plan, then our team can provide a quote and book in your site visits.

Agricultural Research Laboratory Moves: Frequently Asked Questions

Can a plant growth chamber be moved without damaging it?

If the chamber is treated with extreme care and moved according to the manufacturer’s guidance, then yes, it can be relocated to your new site.  We recommend you work with a laboratory relocation specialist such as Benchmark Services.

Can the Agritech lab remain operational during the move?

If you speak to our team while making your plan, we can help you phase and sequence the move so it is completed in stages.  This means your teams are still working until the last moment, and then once their department has been moved, they are operational as quickly as possible.  This limits downtime and can help you stay on track with research milestones.

Can Agritech equipment go into storage if the new lab isn’t ready?

We can provide a wide range of warehousing and storage options, tailored to the length of time you need.  This includes bulky, heavy or powered storage, and we can also offer temperature control if you need to store freezers with us during the move.  Visit our storage and warehousing services page here.